Clear Creek Storage Company, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/24/2009, Docket: RP09-268-000, Status: Effective
Third Revised Sheet No. 44 Third Revised Sheet No. 44
Superseding: Second Revised Sheet No. 44
GENERAL TERMS AND CONDITIONS
(Continued)
Customer until 28 Days after the first release period has ended,
regardless of the rate charged. All releases for more than 31
days or less than one year, prearranged or otherwise, must be
posted for bidding.
(3) Biddable pre-arranged release. A pre-arranged
release, subject to bid, must be posted to the interactive
Internet web site as provided by the capacity release time line
set forth in Section 4.5. If no better offer is received during
the bid period, or if the pre-arranged offer is for the
applicable maximum reservation charge and the full term of the
release, then the pre-arranged Replacement Customer shall become
the Replacement Customer. If the pre-arranged release is for
less than the applicable maximum reservation rate, and a better
offer is received during the bid period, the pre-arranged
Replacement Customer shall have one hour from the time
notification is received from Clear Creek to match the better
offer. If the pre-arranged bidding Customer fails to match the
better offer, then the bidding Customer that presented the better
offer shall become the Replacement Customer.
(4) A Releasing Customer should not be able to specify
an extension of the original bid period or the pre-arranged deal
match period, without posting a new release.
4.10 Volumetric Release. Customer may release capacity on a
volumetric basis provided:
(1) All requirements and conditions of the release are
specified by the Releasing Customer in the release notice,
including any minimum storage volume requirement.
(2) The requirements and conditions specified by the
Releasing Customer meet all of the requirements and conditions of
this tariff.
(3) The volumetric rate for release falls within the
minimum and maximum rate shown on the Statement of Rates of this
tariff. Short-term capacity releases for a term of one year or
less are not subject to the maximum rate limit.
(4) Clear Creek will bill the volumetric rate for
volumes actually received by Clear Creek for the account of the
Replacement Customer; or the minimum storage volume requirement,
if volumes actually received are less than the required minimum
storage requirement.
(5) The Replacement Customer shall remain fully
responsible for all usage charges incurred.