Southern Star Central Gas Pipeline, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2003, Docket: RP03-352-000, Status: Effective
Original Sheet No. 479 Original Sheet No. 479 : Superseded
SERVICE REQUEST FORM
b. TSS-P or STS-P
i. Maximum Daily Transportation Quantity (MDTQ) _______DTH
ii. FTS-P – Maximum Daily Transportation Quantity
(MDTQ) _______DTH
* iii. FSS-Maximum Daily Withdrawal Quantity
(MDWQ) (____FTS-P MDTQ) _______DTH
iv. FSS Maximum Storage Quantity (MSQ)
(MDWQ x 33) _______DTH
* For TSS & STS; FSS – Maximum Daily Withdrawal Quantity (MDWQ) must
be at least ½ but not more than 2/3 of of (i) Maximum Daily
Transportation Quantity (MDTQ).
** For TSS-M or STS-M; (ii) the sum of FTS-M and FTS-P flowing gas
receipts must equal (i) Maximum Daily Transportation of Quanitity
(MDTQ) minus (iv) FSS Maximum Daily Withdrawal Quantity (MDWQ)
plus 100% Market Area Fuel.
c. FTS-M, FTS-P, ITS-M, ITS-P, SFT-M, OR SFT-P
i. Maximum Daily Transportation Quantity (MDTQ) _______DTH
ii. Seasonal MDTQ for FTS associated with FSS
(a) Summer (April-October) _______DTH
(b) Winter (November-March) _______DTH