Southern Star Central Gas Pipeline, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2003, Docket: RP03-352-000, Status: Effective
Original Sheet No. 469 Original Sheet No. 469 : Effective
FORM OF OPERATIONAL BALANCING AGREEMENT
(2) The Parties intend that the quantity actually delivered and
received each day at the Interconnection Point will equal the
confirmed nominations. Each Party will allocate the quantity
which is to be delivered and received at the Interconnection
Point among the Party's respective shippers pursuant to the
Scheduled Quantity. Any difference between the actual physical
flow as shown by the custody measurement facilities and the
Scheduled Quantity is the "Operational Imbalance", which will be
the responsibility of the Parties to eliminate pursuant to this
Agreement. Any Operational Imbalance shall be corrected within
thirty (30) days of the date the amount of the Operational
Imbalance is determined unless the parties agree in writing to
allow a longer period to correct the Operational Imbalance.
(3) Estimated metered quantities shall be used on a daily basis
during the current month to determine the estimated Operational
Imbalance at the Interconnection Point, with physical flow
adjustments to be made during the current month as mutually
agreed to by both Parties to adequately control imbalance levels.
(4) The physical flow at the Interconnection Point each month will be
reported in Dth's and communicated by Southern Star to __________
within one (1) business day following the specified time period
for measurement closing noted in Section 17 of the General Terms
and Conditions of Southern Star FERC Gas Tariff. Measurement of
gas for all purposes hereunder shall be in accordance with the
provisions set forth in Southern Star's then effective FERC Gas
Tariff.
(5) In the event that a capacity constraint occurs on either Party's
facilities which results in curtailment of quantities through the
Interconnection Point, the Party on whose facilities the
constraint has occurred shall determine the reallocation of
Scheduled Quantities to the shippers. Such change in Scheduled
Quantities shall be confirmed with the other party within four
(4) hours of the constraint. If the constraint occurs at the
Interconnection Point, the party which owns the custody
measurement facilities at the Interconnection Point shall be
deemed to have the constraint on its facilities.