Southern Star Central Gas Pipeline, Inc.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2009, Docket: RP09-469-000, Status: Effective

Second Revised Sheet No. 429 Second Revised Sheet No. 429

Superseding: First Revised Sheet No. 429

 

LOCATION EXHIBITS TO

FIRM CONTRACT ________

DATED ________

BETWEEN SOUTHERN STAR CENTRAL GAS PIPELINE, INC.

AND ________________________________

 

EFFECTIVE DATE OF THIS EXHIBIT B: ________

 

_______________ – Primary Delivery Location(s) *

 

Location Location ID Line Segment Rate Area Sec-Twn-Rng County State MDQ(DTH) MDP

________ ___________ _____________ __________ ___________ ______ ______ ________ _________

________ ___________ _____________ __________ ___________ ______ ______ ________ _________

Total: ___________ _____________ __________ ___________ ______ ______ ________ _________

 

 

 

 

 

 

(Shipper)____________________________________ SOUTHERN STAR CENTRAL GAS PIPELINE, INC.

 

By __________________________________________ By ___________________________________________

 

Signature: _________________________________ Signature: __________________________________

 

Title: _____________________________________ Title: ______________________________________

 

Date: _______________ Date: _______________

 

*The sum of the Primary Delivery Point MDQ’s must add up to the MDTQ.

 

MDP Detail by Meter:

Location Meter MDP(PSIG)

_________ _____ _________

_________ _____ _________

_________ _____ _________