Effective Date: 07/10/2009, Docket: RP09-758-000, Status: Effective
Second Revised Sheet No. 276 Second Revised Sheet No. 276
Superseding: First Revised Sheet No. 276
GENERAL TERMS AND CONDITIONS
17. MEASUREMENT AND MEASURING EQUIPMENT (Cont'd)
one-half of the time elapsed since the date of the last equipment test,
to a maximum of fifteen (15) days or back to 9:00 a.m. on the first day
of the current month, whichever is less.
The cutoff for the closing of measurement is five (5) Business Days
after the business month.
Measurement data corrections must be processed within six (6) months of
the production month with a three (3) month rebuttal period. This
standard shall not apply in the case of deliberate omission or
misrepresentation or mutual mistake of fact. The parties' other
statutory or contractual rights shall not otherwise be diminished by
this standard. For treatment of measurement prior period adjustments,
the adjustment will be taken back to the production month. A meter
adjustment becomes a prior period adjustment after the fifth Business
Day following the business month.
Southern Star and Shipper shall design, install, operate and maintain
their respective measurement equipment in such a manner that pulsation
induced measurement error is minimized. Pulsation induced error shall
not exceed one quarter of one percent (0.25%) of square root error
(SRE). Equipment may be used to determine SRE if agreed upon by both
parties.