Southern Star Central Gas Pipeline, Inc.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/10/2009, Docket: RP09-758-000, Status: Effective

Third Revised Sheet No. 113 Third Revised Sheet No. 113

Superseding: Substitute First Revised Sheet No. 113

 

STS RATE SCHEDULE

Small Customer Trans-Storage Service

 

STS-P Production Area

STS-M Market Area

 

3. RATE (Cont'd)

 

(b) The maximum and minimum STS rates for each component part of this

service (FTS-P, FTS-M, FSS and no-notice fee) shall be the Current

Effective Rates shown on the effective applicable Tariff Sheet No.

10, 10A, or 11 in Volume No. 1 of this Tariff. STS-P rates are

applicable to the injection of gas into or withdrawal of gas from

storage (FSS) and the delivery of gas in the Production Area which

was received in the Production Area (FTS-P). STS-M rates are

applicable to the injection of gas into or withdrawal of gas from

storage (FSS) and the delivery of gas in the Market Area which was

received in the Production or Market Areas (FTS-P and FTS-M).

 

(c) Southern Star may charge any rate between the maximum and minimum

rates stated on the applicable Tariff Sheet No. 10, 10A, or 11 on

a non-discriminatory basis. Shipper's delivery of gas quantities

to Southern Star after the effective date of any discounted rates

shall be deemed acceptance by Shipper of such rates; provided,

however, that this provision does not limit a Shipper's right to

receive any refunds to which such Shipper may otherwise be

entitled. Southern Star shall file all required reports with the

Federal Energy Regulatory Commission.

 

(d) Southern Star is not required to offer or provide service at any

rate less than the maximum rate(s) or charge(s) specified on the

applicable Tariff Sheet No. 10, 10A, or 11. Shipper shall pay

such maximum rate(s) for service under this Rate Schedule unless

Southern Star, in its sole judgement, agrees to discount its

rate(s) to Shipper consistent with the applicable provisions of

this tariff. Further, notwithstanding the foregoing, Shipper and

Southern Star may mutually agree to a negotiated rate pursuant to

Section 31 of the General Terms and Conditions.

 

(e) The charges for service under this rate schedule shall include any

other allocated costs or surcharges permitted by the Federal

Energy Regulatory Commission.

 

(f) Fuel and loss is to be reimbursed in kind and is separately stated

for each of the component parts of this service. Fuel and loss

for FTS-M will be based upon received volumes. Fuel and loss for

the FTS-P will be based upon received volumes. Fuel and loss

under component part FSS will be based upon the net daily

quantities injected into storage.