Southern Star Central Gas Pipeline, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2008, Docket: RP08-350-000, Status: Suspended
Second Revised Sheet No. 113 Second Revised Sheet No. 113 : Pending
Superseding: Substitute First Revised Sheet No. 113
STS RATE SCHEDULE
Small Customer Trans-Storage Service
STS-P Production Area
STS-M Market Area
3. RATE (Cont'd)
(b) The maximum and minimum STS rates for each component part of this
service (FTS-P, FTS-M, FSS and no-notice fee) shall be the Current
Effective Rates shown on the effective Tariff Sheet No. 10 or 11
in Volume No. 1 of this Tariff. STS-P rates are applicable to the
injection of gas into or withdrawal of gas from storage (FSS) and
the delivery of gas in the Production Area which was received in
the Production Area (FTS-P). STS-M rates are applicable to the
injection of gas into or withdrawal of gas from storage (FSS) and
the delivery of gas in the Market Area which was received in the
Production or Market Areas (FTS-P and FTS-M).
(c) Southern Star may charge any rate between the maximum and minimum
rates stated on Sheet No. 10 or 11 on a non-discriminatory basis.
Shipper's delivery of gas quantities to Southern Star after the
effective date of any discounted rates shall be deemed acceptance
by Shipper of such rates; provided, however, that this provision
does not limit a Shipper's right to receive any refunds to which
such Shipper may otherwise be entitled. Southern Star shall file
all required reports with the Federal Energy Regulatory
Commission.
(d) Southern Star is not required to offer or provide service at any
rate less than the maximum rate(s) or charge(s) specified on
Tariff Sheet No. 10 or 11. Shipper shall pay such maximum rate(s)
for service under this Rate Schedule unless Southern Star, in its
sole judgement, agrees to discount its rate(s) to Shipper
consistent with the applicable provisions of this tariff.
Further, notwithstanding the foregoing, Shipper and Southern Star
may mutually agree to a negotiated rate pursuant to Section 31 of
the General Terms and Conditions.
(e) The charges for service under this rate schedule shall include any
other allocated costs or surcharges permitted by the Federal
Energy Regulatory Commission.
(f) Fuel and loss is to be reimbursed in kind and is separately stated
for each of the component parts of this service. Fuel and loss
for FTS-P will be based upon received quantities from receipt
points, pooling agreements, or withdrawn from storage in the
Production Area. Fuel and loss for the FTS-M will be based upon
received quantities from receipt points, pooling agreements, or
withdrawn from storage in the Market Area. Fuel and loss under
component part FSS will be based upon the net daily quantities
injected into storage.