Southern Star Central Gas Pipeline, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2004, Docket: RP04-276-002, Status: Effective
Substitute Third Revised Sheet No. 105 Substitute Third Revised Sheet No. 105 : Effective
Superseding: Second Revised Sheet No. 105
TSS RATE SCHEDULE
Trans-Storage Service
TSS-P Production Area
TSS-M Market Area
3. RATE (Cont'd)
(f) Fuel and loss is to be reimbursed in kind and is separately stated
for each of the component parts of this service. Fuel and Loss
for FTS-P will be based on received quantities. Fuel and loss for
FTS-M will be based upon received quantities. Fuel and loss for
FSS will be based upon the net daily quantities injected into
storage.
4. MONTHLY BILL
The bill for deliveries during each billing period under this rate
schedule shall be calculated using the applicable Reservation Charge(s),
the applicable Commodity Charge(s), and the applicable surcharges, as
follows:
(a) (i) The Reservation Charge for TSS-P Service shall be the
product of (1) the sum of the daily quantity rights for each
component part of TSS-P (FTS-P and FSS) and (2) the
applicable Maximum Reservation Rate for the component part
services of TSS-P or such lesser Reservation Rate(s) as may
have been made effective from time to time during the
billing period, plus any applicable reservation surcharges.
(ii) The Reservation Charge for TSS-M shall be the product of (1)
the sum of the daily quantity rights for each component part
of TSS-M (FTS-P if applicable, FTS-M and FSS) and (2) the
applicable Maximum Reservation Rate for the component part
services of TSS-M or such lesser Reservation Rate(s) as
may have been made effective from time to time during the
billing period, plus any applicable reservation surcharges.
(iii) Southern Star will not assess reservation surcharges on
deliveries to interfaces or pools when such quantities are
delivered to another downstream transportation agreement
with Southern Star.