Cheyenne Plains Gas Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/26/2010, Docket: RP10-876-000, Status: Effective
Original Sheet No. 276 Original Sheet No. 276
GENERAL TERMS AND CONDITIONS
(Continued)
9. CAPACITY RELEASE PROGRAM (Continued)
9.15 Effective Date of Release and Acquisition. The effective date of the
release by a Releasing Shipper and acquisition by a Replacement
Shipper shall be on the date so designated in the Replacement
Capacity Agreement (posted term effective date).
9.16 Rates
(a) The reservation rate for any released firm capacity under Rate
Schedule FT shall be the reservation rate bid by the
Replacement Shipper. Such reservation rate and reservation
surcharge(s) shall not be less than Transporter's minimum or
more than Transporter's maximum reservation rate and
reservation surcharge(s) under the applicable rate schedule as
in effect from time to time, except as noted in Section
9.10(c) of the GT&C. For purposes of bidding and awarding,
maximum/minimum rates specified by the Releasing Shipper shall
include the tariff reservation rate and all reservation
surcharges, as a total number or as stated separately (NAESB
WGQ Standard 5.3.27).
(b) Replacement Shipper shall pay the applicable maximum commodity
rate in addition to all other applicable charges and
surcharge(s) for the service rendered unless otherwise agreed
by Transporter. In the event that the Releasing Shipper has
agreed to a negotiated rate pursuant to Section 4.12, the
Replacement Shipper shall pay the commodity charge(s)
applicable to the Releasing Shipper's contract.
(c) For releases based on a volumetric reservation rate, the
minimum and maximum rates shall be computed by converting the
reservation rate to a daily rate by multiplying the maximum
and minimum reservation rate by 12 Months and dividing that
product by 365 Days or 366 Days as appropriate.
9.17 Marketing Fee. A Releasing Shipper may request that Transporter
actively market the capacity to be released. In such event, the
Releasing Shipper and Transporter shall negotiate the terms of the
marketing service to be provided by Transporter and the marketing
fee to be charged therefore.