Cheyenne Plains Gas Pipeline Company, L.L.C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/26/2010, Docket: RP10-876-000, Status: Effective

First Revised Sheet No. 256 First Revised Sheet No. 256

Superseding: Original Sheet No. 256

 

GENERAL TERMS AND CONDITIONS

(Continued)

8. OPERATING PROVISIONS

8.1(a) Segmentation of Capacity (Continued)

 

(B) Segmentation is subject to the availability of capacity

and existing contractual obligations at and between the

new receipt point(s) and/or delivery point(s) established

as a result of Segmentation.

 

(C) The thermal content of gas being received at Segmented

points must be no less than the thermal content of gas

received at the original receipt point under the Shipper's

TSA.

 

(D) Shipper may nominate and tender and Transporter may

confirm and receive quantities pursuant to Segmentation

transactions which exceed Shipper's MDQ. However, the

quantity of capacity usage on any Segment which exceeds

Shipper's MDQ shall be considered Overrun Gas and shall be

invoiced at the applicable maximum Authorized Overrun

Rate.

 

(iii) Implementation of Segmentation.

 

(A) Segmentation transactions for which the receipt or

delivery point lies within Shipper's Primary Receipt-to-

Delivery Flow Path are to be scheduled as primary for the

portion of the transaction that is within Shipper's

Primary Receipt-to-Delivery Flow Path and Flow Path

Secondary for the portion of the transaction outside such

flow path. However, Shipper may request to acquire

primary rights at the receipt and/or delivery point from

Transporter, pursuant to Section 8.1(b)(ii).

 

(B) Segmentation transactions entirely outside the Primary

Receipt-to-Delivery Flow Path are to be scheduled as

Secondary Capacity.

 

(C) Both Releasing and Replacement Shippers may utilize

Secondary Capacity. However, the combined nominations of

such Shippers on any Segment are limited to the original

contractual MDQ. Based on the replacement TSA's MDQ,

Secondary Capacity on a Segment shall be allocated on a

pro rata basis between the Releasing and Replacement

Shippers up to the original contractual MDQ. Capacity

utilized above the Secondary Capacity Allocation shall be

scheduled and invoiced as authorized overrun.