Cheyenne Plains Gas Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/26/2010, Docket: RP10-876-000, Status: Effective
First Revised Sheet No. 256 First Revised Sheet No. 256
Superseding: Original Sheet No. 256
GENERAL TERMS AND CONDITIONS
(Continued)
8. OPERATING PROVISIONS
8.1(a) Segmentation of Capacity (Continued)
(B) Segmentation is subject to the availability of capacity
and existing contractual obligations at and between the
new receipt point(s) and/or delivery point(s) established
as a result of Segmentation.
(C) The thermal content of gas being received at Segmented
points must be no less than the thermal content of gas
received at the original receipt point under the Shipper's
TSA.
(D) Shipper may nominate and tender and Transporter may
confirm and receive quantities pursuant to Segmentation
transactions which exceed Shipper's MDQ. However, the
quantity of capacity usage on any Segment which exceeds
Shipper's MDQ shall be considered Overrun Gas and shall be
invoiced at the applicable maximum Authorized Overrun
Rate.
(iii) Implementation of Segmentation.
(A) Segmentation transactions for which the receipt or
delivery point lies within Shipper's Primary Receipt-to-
Delivery Flow Path are to be scheduled as primary for the
portion of the transaction that is within Shipper's
Primary Receipt-to-Delivery Flow Path and Flow Path
Secondary for the portion of the transaction outside such
flow path. However, Shipper may request to acquire
primary rights at the receipt and/or delivery point from
Transporter, pursuant to Section 8.1(b)(ii).
(B) Segmentation transactions entirely outside the Primary
Receipt-to-Delivery Flow Path are to be scheduled as
Secondary Capacity.
(C) Both Releasing and Replacement Shippers may utilize
Secondary Capacity. However, the combined nominations of
such Shippers on any Segment are limited to the original
contractual MDQ. Based on the replacement TSA's MDQ,
Secondary Capacity on a Segment shall be allocated on a
pro rata basis between the Releasing and Replacement
Shippers up to the original contractual MDQ. Capacity
utilized above the Secondary Capacity Allocation shall be
scheduled and invoiced as authorized overrun.