Cheyenne Plains Gas Pipeline Company, L.L.C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/26/2010, Docket: RP10-876-001, Status: Effective

Second Revised Sheet No. 250 Second Revised Sheet No. 250

Superseding: Original Sheet No. 250

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

6. NOMINATIONS AND SCHEDULING PROCEDURES(Continued)

6.2(c) Nomination Procedures (Continued)

 

(vii)Intraday nominations can be used to request increases

or decreases in total flow, changes to receipt points,

or changes to delivery points of scheduled gas (NAESB

WGQ Standard 1.3.11). However, requests for decrease

in flow shall only be accepted to the extent they do

not represent a decrease below previous confirmed

quantities which would have flowed on the requested Gas

Day prior to the nominated decrease, assuming even

Hourly flow rates. Intraday nominations do not

rollover (i.e. Intraday nominations span one Day only).

Intraday nominations may be used to nominate new supply

or market (NAESB WGQ Standard 1.3.33).

 

(viii)Transporter will re-determine scheduled quantities,

pursuant to the scheduling priorities of Section 6.3, at

the Evening, Intraday 1 and Intraday 2 Nomination Cycles

when such scheduled quantities are affected by a

discount requested by Shipper and granted by

Transporter. Such re-determination may cause a

discounted firm Shipper that receives a discount after

Gas as been scheduled to be Bumped.

 

(ix) Scheduling of Intraday Nominations. For purposes of

determining the portion of any intraday nomination which

is to be scheduled when available capacity is not

sufficient to schedule all confirmed quantities, all

intraday nominations shall first be cumulated with all

prior confirmed daily and intraday nominations for that

gas Day and compared to Shipper's MDQ. For the intraday

nomination being processed, if the cumulated nomination

quantity is in excess of MDQ, that portion of the

quantity in excess of MDQ and any subsequently processed

intraday nomination under that TSA shall be considered

as using overrun capacity.

 

(d) Nominated Imbalance Quantities. Shippers may separately nominate

quantities to resolve imbalances. However, in the event that an

imbalance quantity is included within another nomination, the

portion of such nomination which is out of balance will be

scheduled pursuant to Section 6.5.