Cheyenne Plains Gas Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/26/2010, Docket: RP10-876-001, Status: Effective
Second Revised Sheet No. 250 Second Revised Sheet No. 250
Superseding: Original Sheet No. 250
GENERAL TERMS AND CONDITIONS
(Continued)
6. NOMINATIONS AND SCHEDULING PROCEDURES(Continued)
6.2(c) Nomination Procedures (Continued)
(vii)Intraday nominations can be used to request increases
or decreases in total flow, changes to receipt points,
or changes to delivery points of scheduled gas (NAESB
WGQ Standard 1.3.11). However, requests for decrease
in flow shall only be accepted to the extent they do
not represent a decrease below previous confirmed
quantities which would have flowed on the requested Gas
Day prior to the nominated decrease, assuming even
Hourly flow rates. Intraday nominations do not
rollover (i.e. Intraday nominations span one Day only).
Intraday nominations may be used to nominate new supply
or market (NAESB WGQ Standard 1.3.33).
(viii)Transporter will re-determine scheduled quantities,
pursuant to the scheduling priorities of Section 6.3, at
the Evening, Intraday 1 and Intraday 2 Nomination Cycles
when such scheduled quantities are affected by a
discount requested by Shipper and granted by
Transporter. Such re-determination may cause a
discounted firm Shipper that receives a discount after
Gas as been scheduled to be Bumped.
(ix) Scheduling of Intraday Nominations. For purposes of
determining the portion of any intraday nomination which
is to be scheduled when available capacity is not
sufficient to schedule all confirmed quantities, all
intraday nominations shall first be cumulated with all
prior confirmed daily and intraday nominations for that
gas Day and compared to Shipper's MDQ. For the intraday
nomination being processed, if the cumulated nomination
quantity is in excess of MDQ, that portion of the
quantity in excess of MDQ and any subsequently processed
intraday nomination under that TSA shall be considered
as using overrun capacity.
(d) Nominated Imbalance Quantities. Shippers may separately nominate
quantities to resolve imbalances. However, in the event that an
imbalance quantity is included within another nomination, the
portion of such nomination which is out of balance will be
scheduled pursuant to Section 6.5.