Cheyenne Plains Gas Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/26/2010, Docket: RP10-876-000, Status: Effective
First Revised Sheet No. 248 First Revised Sheet No. 248
GENERAL TERMS AND CONDITIONS
(Continued)
6. NOMINATIONS AND SCHEDULING PROCEDURES(Continued)
6.1 Nomination Cycles (Continued)
(vii) Gas Day Affected by
Intraday Nomination begins 9:00 a.m. ------ -------
(viii) Nomination Effective Time 9:00 a.m. 5:00 p.m. 9:00 p.m.
(Grid-wide synchronization
Times, NAESB WGQ Standard
1.3.41)
6.2 Nomination Procedures. Nominating parties will submit nominations
to Transporter in accordance with the procedures and conditions set
forth in this section. However, Transporter reserves the right to
accept nominations after the deadlines specified in Section 6.1,
provided that no Shipper will be disadvantaged by such action.
(a) All nominations should be considered original nominations and
should be replaced to be changed. When a nomination for a
date range is received, each Day within that range is
considered an original nomination. When a subsequent
nomination is received for one or more Days within that range,
the previous nomination is superseded by the subsequent
nomination only to the extent of the Days specified. The Days
of the previous nomination outside the range of the subsequent
nomination are unaffected. Nominations have a prospective
effect only (NAESB WGQ Standard 1.3.7).
(b) All nominations should include Shipper defined begin and end
dates. All nominations excluding intraday nominations should
have roll-over options. Specifically, Shippers should have
the ability to nominate for several Days, Months, or years,
provided the nomination begin and end dates are within the
term of Shipper's contract (NAESB WGQ Standard 1.3.5). For
the date specified in the nomination, all nominations received
by Transporter at or prior to a nomination deadline for that
date shall be processed in the next available nomination cycle
pursuant to this section.