Cheyenne Plains Gas Pipeline Company, L.L.C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/26/2010, Docket: RP10-876-000, Status: Effective

Second Revised Sheet No. 224 Second Revised Sheet No. 224

Superseding: First Revised Sheet No. 224

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

4. REQUEST FOR SERVICE (Continued)

4.5 Capacity Reserved for Expansion Projects (Continued)

 

(c) If Transporter elects to reserve capacity, it will notify

Shippers of its intent as part of its posting of capacity on

its EBB. Transporter's posting for reserved capacity for

future expansion projects shall include the following

information: (i) a description of the project for which the

capacity will be reserved; (ii) the total quantity of capacity

to be reserved; (iii) the location of the proposed reserved

capacity on the pipeline system; (iv) whether, and if so when,

Transporter anticipates that an open season for the capacity

will be held or the reserved capacity will otherwise be posted

for bids; (v) the projected in-service date of the new

facilities; and (vi) on an ongoing basis, how much of the

reserved capacity has been sold on a limited-term basis that

would otherwise be eligible for a ROFR. The posting for

reserved capacity shall also include a non-binding

solicitation for Turnback Capacity to serve the expansion

project, provided that Transporter shall post the non-binding

solicitation for Turnback Capacity no later than 90 Days after

the close of the expansion project open season. Transporter

shall make reasonable efforts to ufte the posting up to the

in-service date of the project to reflect any material changes

in the scope of the project.

 

(d) When reserving capacity for future expansion projects,

Transporter must make the capacity generally available to

Shippers prior to the reservation period. When an open season

is held prior to the expansion project open season,

Transporter shall have the right to state in the open season

posting minimum terms and conditions for bids that would be

acceptable for consideration that are the same as the minimum

terms and conditions anticipated for the future expansion

project open season. In the event that the subsequent

expansion project open season imposes minimum terms and

conditions that are materially different from the terms and

conditions imposed in the previous capacity open season,

Transporter shall hold another open season for the capacity

that uses the same minimum terms and conditions as were

imposed for the expansion project open season. If the

expansion project open season is held prior to or during the

capacity open season, Transporter shall use the same minimum

terms and conditions as used for the expansion project open

season.