Cheyenne Plains Gas Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2008, Docket: RP08-502-000, Status: Effective
First Revised Sheet No. 21 First Revised Sheet No. 21
Superseding: Original Sheet No. 21
STATEMENT OF RATES
FOOTNOTES
_______________________________
1/ For Capacity Release transactions only, Transporter has adopted the
following NAESB WGQ standards. On the bidding formats, the number of
decimal places for offers, bids and awards should be equal to the number
of decimal places in the stated rates per pipeline rate schedule (NAESB
WGQ Standard 5.3.21). Converting a Daily rate to a Monthly rate is
accomplished by multiplying the Daily rate times the number of Days in
the rate period, dividing the result by the number of Months in the rate
period, taking the remainder out to 5 decimal places, and rounding up or
down to the Transporter's specified decimal place. Converting a Monthly
rate to a Daily rate is accomplished by multiplying the Monthly rate by
the number of Months in the rate period; dividing the result by the
number of Days in the rate period, taking the remainder out to 5 decimal
places, and rounding up or down to the Transporter's specified decimal
place (NAESB WGQ Standard 5.3.22). Furthermore, for capacity release
purposes, all Tariff rates should be adjusted to reflect a standard
calculation of Daily and Monthly rates (NAESB WGQ Standard 5.3.23).
2/ Unauthorized Overrun Rate
Less than 3% of MDQ: Applicable authorized
overrun rate.
Greater than or equal to 3% of MDQ: 2 times Maximum IT rate.
(Non-Critical Condition)
Greater than or equal to 3% of MDQ: 10 times Cash Out Index Price
(Critical Condition)
3/ The transportation rate shall be adjusted to include the FERC Annual
Charge Adjustment (ACA).