Chandeleur Pipe Line Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2003, Docket: RP03-347-000, Status: Effective
Second Revised Sheet No. 46 Second Revised Sheet No. 46 : Effective
Superseding: First Revised Sheet No. 46
GENERAL TERMS
AND CONDITIONS
8.0 ACCOUNTING PROCEDURES (Cont'd)
8.1 Allocation (cont'd)
(d) Shippers shall cause the Operators at each
point to provide Chandeleur with a PDA. In the
event any Shipper at a receipt or delivery
point fail to cause such information to be
provided by Operator to Chandeleur, then the
default allocation methodology described in
Section 8.1(e) will be applied to all Shippers
at the point. To the extent an Operator has
submitted a PDA for a point, the Shippers with
multiple scheduled nominations at that point
may submit a PDA to Chandeleur for purposes of
further allocation.
(e) Absence of a PDA Methodology
In the absence of an allocation methodology,
as referenced above, the default allocation
procedures set forth below determine how Gas
is to be allocated at each Pipeline point when
the Gas quantities scheduled and the Gas
quantities that actually flowed, vary.
(1) In the event actual Gas flow at a receipt
or delivery point equals the scheduled
Gas flow at that point, then all Shippers
will receive their confirmed nominations.
(2) In the event actual Gas flow at a receipt
or delivery point is less than scheduled
Gas flow at that point, actual Gas flow
will be allocated as follows: The volume
of gas scheduled for delivery by
Chandeleur shall be allocated pro rata
based on the scheduled quantities up to,
but not in excess of, scheduled confirmed
quantities.