Chandeleur Pipe Line Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2003, Docket: RP03-220-000, Status: Effective
Third Revised Sheet No. 8 Third Revised Sheet No. 8 : Effective
Superseding: Second Revised Sheet No. 8
RATE SCHEDULE FT
FIRM TRANSPORTATION SERVICE
4.0 QUANTITY (Cont'd)
4.2 Delivery (cont'd)
(b) Insofar as operating conditions permit,
deliveries of Gas by Chandeleur to Shipper will
be made at hourly and daily rates. Such
deliveries will correspond as nearly as
practicable to the hourly and daily rates at
which Gas is received by Chandeleur for the
account of Shipper. Further, Chandeleur will
not be obligated to deliver during any single
hour more than one twenty-fourth (1/24) of the
Maximum Daily Quantity, but may make deliveries
to Shipper without regard to such limitation to
the extent that, in Chandeleur's sole
determination, it can do so without impairment
of the operation of its system.
5.0 FUEL AND LINE LOSSES
A Fuel and Line Loss Allowance will be retained on all
allocated receipt volumes pursuant to Section 21.0 of the
General Terms and Conditions herein.
6.0 ELECTION OF FIRM TRANSPORTATION SERVICE
6.1 Firm Transportation Service Request Queue
If no firm capacity exists at the time the request
for service is received, Shipper will be placed on
the firm transportation service request queue.
Shipper may receive information on available
pipeline capacity pursuant to Section 19.4 of the
General Terms and Conditions.