Cheniere Creole Trail Pipeline, L.P.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/28/2008, Docket: RP08-137-000, Status: Effective

Original Sheet No. 117 Original Sheet No. 117 : Pending

 

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

E. Failure of Meters.

 

In the event a meter is out of service or registering inaccurately as defined

in Section F below, the volume of gas delivered hereunder shall be estimated:

 

1. by using the registration of any check meter or meters if installed and

accurately registering, or

 

2. by correcting the error if the percentage of error is ascertainable by

calibration, test or mathematical calculation, or

 

3. by estimating the volume of delivery by reference to deliveries made by

Transporter through such meter during the most recent period under similar

conditions when the meter was registering accurately.

 

F. Test of Meters.

 

The accuracy of the Transporter's measuring equipment shall be verified by

Transporter at reasonable intervals, and at least annually, and, if requested,

in the presence of representatives of the Shipper; but Transporter shall not

be required to verify the accuracy of such equipment more frequently than once

in any thirty-day (30) period. In the event either Transporter or the Shipper

shall notify the other party that it desires a special test of any measuring

equipment, Transporter and the Shipper shall cooperate to secure a prompt

verification of the accuracy of such equipment.