Cheniere Creole Trail Pipeline, L.P.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/28/2008, Docket: RP08-137-000, Status: Effective
Original Sheet No. 117 Original Sheet No. 117 : Pending
GENERAL TERMS AND CONDITIONS
(Continued)
E. Failure of Meters.
In the event a meter is out of service or registering inaccurately as defined
in Section F below, the volume of gas delivered hereunder shall be estimated:
1. by using the registration of any check meter or meters if installed and
accurately registering, or
2. by correcting the error if the percentage of error is ascertainable by
calibration, test or mathematical calculation, or
3. by estimating the volume of delivery by reference to deliveries made by
Transporter through such meter during the most recent period under similar
conditions when the meter was registering accurately.
F. Test of Meters.
The accuracy of the Transporter's measuring equipment shall be verified by
Transporter at reasonable intervals, and at least annually, and, if requested,
in the presence of representatives of the Shipper; but Transporter shall not
be required to verify the accuracy of such equipment more frequently than once
in any thirty-day (30) period. In the event either Transporter or the Shipper
shall notify the other party that it desires a special test of any measuring
equipment, Transporter and the Shipper shall cooperate to secure a prompt
verification of the accuracy of such equipment.