GENERAL TERMS AND CONDITIONS
(Continued)
3. PRESSURE
Shipper shall deliver gas to Transporter at the pressure required from time to
time to enable the gas to enter Transporter's facilities at the Receipt
Point(s), but in no event shall such pressure exceed the maximum allowable
operating pressure of Transporter's system at such point(s). Transporter's
pipeline system is currently designed for a maximum allowable operating
pressure of 1440 psig, but may be subject to reduced maximum operating
pressures at certain locations pursuant to the requirements of regulatory
authorities.
Transporter shall deliver gas to Shipper or Shipper's designee at
Transporter's line pressure existing at the Delivery Point(s).