Caprock Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1999, Docket: RP99-452-000, Status: Effective
Original Sheet No. 40 Original Sheet No. 40 : Effective
17. DIRECT ACCESS REQUEST AND TRACKING SYSTEM (DART)
17.1 DESCRIPTION OF DART
(a) Transporter maintains a twenty-four (24) hour
interactive electronic system, the Direct Access Request and Tracking
System (DART). DART is available for use by all Shippers and other
interested parties upon request and at no charge. The DART system
provides on-line help and interactive search functions permitting
users to locate a specific transaction. Additionally, it provides
customers the ability to download a file from DART or to split files
into smaller files prior to such download. Daily back-up records of
the information displayed on DART will be archived and accessible to
customers on a non-discriminatory basis. The data will be kept for a
rolling three (3) year period, inclusive of both current and archived
data.
(b) The DART system provides access to a variety of
features including Information Postings and Planning Tools,
Nominations, Volume Inquiry, Contract Request Processing, Capacity
Release Request and Bid Processing, Discount Request Processing and
FERC 497.
(1) INFORMATION POSTINGS AND PLANNING TOOLS
The types of information available through the
Information Postings and Planning Tools on DART include: (i) reports
on operationally available capacity, unsubscribed capacity, and
released capacity at Receipt/Delivery Points and on the mainline;
(ii) information on construction and maintenance projects impacting
capacity; (iii) imbalance volumes available for trading among
Shippers prior to cashout; (iv) firm and interruptible rates and
fuels, including general discount offers; (v) catalog of currently
active Receipt and Delivery Points; (vi) general announcements and
procedures, including Operational Flow Orders;
(2) NOMINATIONS
This feature allows for submittal of all transportation nominations,
transfer nominations, predetermined allocations and nomination
priorities as required in Section 16.