Caprock Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/02/1998, Docket: RP99- 71-001, Status: Effective
Substitute First Revised Sheet No. 37A Substitute First Revised Sheet No. 37A : Effective
Superseding: First Revised Sheet No. 37A
GENERAL TERMS AND CONDITIONS, continued
(c) The Intra-day 1 Nomination Cycle: 10:00 a.m. for nominations
leaving control of the nominating party; 10:15 a.m. for receipt
of nominations by Transporter; 10:30 a.m. to send Quick
Response; 1:00 p.m. for receipt of completed confirmations by
Transporter from upstream and downstream connected parties; 2:00
p.m. for Transporter to provide scheduled quantities to affected
shippers and point operators, and to provide scheduled quantities
to bumped parties (notice to bumped parties), (central clock time
on the gas Day). Scheduled quantities resulting from Intra-day 1
Nominations should be effective at 5:00 p.m. on the gas Day.
(d) The Intra-day 2 Nomination Cycle: 5:00 p.m. for nominations
leaving control of the nominating party; 5:15 p.m. for receipt
of nominations by Transporter; 5:30 p.m. to send Quick Response;
8:00 p.m. for receipt of completed confirmations by Transporter
from upstream and downstream connected parties; 9:00 p.m. for
Transporter to provide scheduled quantities to affected shippers
and point operators (central clock time on the gas Day).
Scheduled quantities resulting from Intra-day 2 Nominations
should be effective at 9:00 p.m. on the gas Day. Bumping is not
allowed during the Intra-day 2 Nomination Cycle.
(e) For purposes of Section 16.1 (b)(c) and (d), “provide” shall
mean, for transmittals pursuant to standards 1.4.x, receipt at
the designated site, and for purposes of other forms of
transmittal, it shall mean send or post.
16.2 Include in the nomination the daily quantity of gas to
be received by Transporter (including Shipper's
transportation volumes and Btu levels, overrun
volumes, any volumes to satisfy past imbalances, and
any Fuel Reimbursement Quantity for volumes at each
specified Receipt Point), receipt points (primary
and/or secondary), Shipper defined beginning and
ending dates, and the daily quantity to be delivered
by Transporter at each specified delivery point
(primary and/or secondary) on the desired gas day, but
no sooner than the following day. All nominations,
including intra-day nominations, should be based on
daily quantity,