Caprock Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1999, Docket: RP99-452-000, Status: Effective
Original Sheet No. 23K Original Sheet No. 23K : Effective
13.6 OPEN SEASON EXCEPTIONS
An open season is not required for: (a) a Prearranged
Release for the maximum reservation charge applicable to the capacity
being released; or (b) a Short-term Prearranged Release. A Capacity
Release Request which is not subject to an open season need only
contain the information required in Sections 13.4(a) and (b). Such
Capacity Release Request must be delivered to Transporter's DART
system (or in writing for posting on Transporter's DART system if
Transporter's DART system is unavailable for receiving Capacity
Release Requests) sufficiently in advance so that the release may
become effective under Section 13.9 before the release transaction is
to commence. A Releasing Shipper may not rollover, extend or in any
way continue a Short-term Prearranged Release with the same
Replacement or Subreplacement Shipper until twenty-eight (28) days
after the Short-term Prearranged Release has ended unless the
Releasing Shipper complies with the Capacity Release Request
provisions in Sections 13.3 and 13.4.
13.7 POSTINGS; OPEN SEASON
(a) A Capacity Release Request received by Transporter via EDI
(which is applicable only for Prearranged Capacity Release Request)
or through the DART system prior to the starting time of the open
season requested by the Releasing Shipper in its Capacity Release
Request in conformance with this Section 13 shall be posted on
Transporter's DART system as requested. The posting shall contain the
information contained in the Capacity Release Request, except that
all identifying information, and the minimum price in any minimum
price condition requested to be held confidential by the Releasing
Shipper (but not the existence of the minimum bid condition), shall
be kept confidential and shall not be posted. The posting shall also
include the maximum reservation charge (including all reservation
surcharges) applicable to the capacity subject to the Capacity
Release Request, the beginning and ending time for the open season
and the time the notice was posted. Transporter shall post the
Capacity Release Request upon receipt, unless the Releasing Shipper
requests otherwise. If the Releasing Shipper requests a posting time,
Transporter will comply with that request as long as it comports with
the deadlines set forth in this Section 13.