Caprock Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1999, Docket: RP99-452-000, Status: Effective
Original Sheet No. 23E Original Sheet No. 23E : Effective
(a)The Releasing Shipper's legal name, address and phone number,
the Eligible Firm Transportation Agreement number, the date of the
Eligible Firm Transportation Agreement and the name and title of the
individual responsible for authorizing the capacity release;
(b)The quantity of the capacity (in Dth per day) and the
transportation path(s) being released, including identification by
Transporter's PIN Number of the Receipt Points, Delivery Points, and
the firm capacity to be released at each such point;
(c)Whether the capacity being released is subject to recall
and/or reput, and if so, the exact conditions for such recall and/or
reput (which conditions must conform to Sections 13.5 and 13.14);
(d)The proposed effective date and proposed term of the release;
(e)Whether the Releasing Shipper wants Transporter to actively
market the Releasing Shipper's capacity rights;
(f)Whether the Releasing Shipper will accept Qualified Bids
which are contingent on subsequent events (such as the subsequent
purchase of upstream or downstream capacity), and if so, what events
and the last date by which such contingency must be fulfilled;
(g)The starting date for the open season and the length of time
for the open season (which must conform to Section 13.7);
(h)Whether the Releasing Shipper will accept Qualified Bids
whose revenues will vary by the volume transported, and if so, any
minimum amount to be billed as a reservation charge even if there is
no flow (or insufficient flow);
(i)Which of the bid evaluation procedures set forth in Section
13.10 the Shipper wishes to use, if any;
(j)Whether the Qualified Bids are to specify dollars and cents
and/or percents of maximum tariff rate; and