14. RATES OF FLOW

 

14.1 Uniform Flow Rates. Point Operator shall take gas at rates as

constant as operationally feasible throughout the day and, except

as provided in Section 14.2, Pipeline shall not be obligated to

deliver gas in excess of uniform hourly rates.

 

14.2 Authorized Fluctuations in Flow Rates. Shipper may take gas at

its Primary Delivery Point(s) at an hourly rate necessary to

serve its firm markets or firm requirements; provided, however,

that Shipper is not entitled to take, and Pipeline is not

obligated to deliver, gas at an hourly rate at any Delivery Point

in excess of six (6) percent of the MDDQ per hour for such

Delivery Point if such delivery would threaten the integrity of

Pipeline’s system, including the ability to deliver to any other

Shipper its MDDQ.

 

14.3 Installation of Flow Control Equipment. Pipeline may elect to

construct, install, and operate flow control equipment at any

location on its system whenever it determines in its reasonable

judgment that such equipment will contribute to the safe,

reliable, efficient, and orderly operation of its system in a

manner that is consistent with its obligations to provide service

under all of its rate schedules. If necessary, Pipeline may

install such flow control equipment at Point Operator’s expense

to assure compliance with this Section 14.