Carolina Gas Transmission Corporation
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/06/2007, Docket: RP07-519-000, Status: Effective
First Revised Sheet No. 157 First Revised Sheet No. 157 : Effective
Superseding: Original Sheet No. 157
(b) Transco. A Shipper receiving gas through the interconnect
between Pipeline and Transco may elect through the Internet
Website, prior to the completion of the last nomination
cycle, to have a daily imbalance on Pipeline associated
with allocated unscheduled quantities resolved through an
imbalance resolution transaction within two (2) Gas Days
after the end of the Gas Day in which the imbalance
occurred. Failure to resolve such allocated unscheduled
quantities through an imbalance resolution transaction
within such period will result in Shipper losing its no-
notice flexibility on Pipeline until the imbalance is
resolved. If such failure, in Pipeline’s reasonable
judgment, interferes with operations between Pipeline and
Transco, Pipeline may issue an OFO requiring Shipper
immediately to resolve the imbalance on Pipeline through an
imbalance resolution transaction. If the above conditions
are not met, the allocated unscheduled quantities will
result in an imbalance under GT&Cs Section 19 for the Gas
Day the imbalance was incurred.
13.6 Maximization. For purposes of billing, unless otherwise notified
by Shipper, Pipeline will reallocate Shipper’s total quantities
transported each Gas Day in a zone from Shipper’s Recourse Rate
interruptible services to un-utilized portions of Shipper’s firm
services.