Carolina Gas Transmission Corporation
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/25/2009, Docket: RP09-296-000, Status: Effective
Second Revised Sheet No. 156 Second Revised Sheet No. 156
Superseding: First Revised Sheet No. 156
(e) Deliveries at Pipeline Interconnections. An imbalance for
an OBA Party shall be based on the difference between total
actual quantities of gas received or delivered through the
affected meter and the total aggregated scheduled
quantities for that meter. Under the OBA, the total
aggregated scheduled quantities for that meter shall be
deemed to be the actual quantities of gas received or
delivered for each Shipper. Imbalances will be resolved
under the OBA between Pipeline and the OBA Party.
13.4 Determination of Receipts and Deliveries to Resolve Imbalances.
Imbalance quantities that are being resolved in kind shall be
deemed to be the last through the meter.
13.5 Upstream Pipeline Flexibility. Shipper may deviate from its
scheduled firm transportation quantity on a Gas Day by satisfying
the requirements herein; provided that nothing herein shall
authorize Shipper to receive gas under its firm transportation
services on Pipeline, including any no-notice flexibility, in
excess of Shipper’s MDTQ.
(a) SNG. To the extent allowed under an OBA between Pipeline
and SNG, a Shipper subscribing to no-notice transportation
service under SNG’s Rate Schedule FT-NN may elect through
the Internet Website to have any allocated unscheduled
quantities reported to SNG to resolve daily imbalances on
Pipeline up to Shipper’s no-notice entitlement on SNG. In
order for Shipper to receive no-notice flexibility on a Gas
Day, Shipper shall, prior to the completion of the last
nomination cycle: (i) ensure that its no-notice entitlement
is reported to Pipeline by SNG; and (ii) elect through the
Internet Website to have Pipeline report to SNG allocated
unscheduled quantities for that Gas Day. If conditions (i)
and (ii) are not met, the allocated unscheduled quantities
will result in an imbalance under GT&Cs Section 19 for the
Gas Day the imbalance was incurred. Pipeline will not
report to SNG changes to the original allocation later than
5:00 P.M. CCT on the second calendar day following the end
of the Gas Day.