Carolina Gas Transmission Corporation
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/06/2007, Docket: RP07-519-000, Status: Effective
First Revised Sheet No. 153 First Revised Sheet No. 153 : Effective
Superseding: Original Sheet No. 153
13. DETERMINATION OF RECEIPTS AND DELIVERIES
13.1 Determination of Receipts. Shipper’s allocated receipts shall be
the scheduled quantities at the Receipt Point. Any imbalances
resulting from a variation between the aggregate of Shipper’s
allocated receipts and measured flow at an interconnection, which
are not resolved pursuant to Section 13.5, shall be managed under
an OBA between such interconnecting party and Pipeline. Shipper
shall be responsible for any imbalances that it creates on any
upstream pipeline.
13.2 Determination of Deliveries. Shipper’s allocated deliveries
shall be determined by either a PDA methodology or OBA at the
Delivery Point.
(a) If no OBA exists for a Delivery Point, the Delivery Point
Operator shall, within 48 hours after the Gas Day when such
PDA will be effective, provide Pipeline (or Shipper shall
cause the interconnecting Delivery Point Operator to
provide Pipeline, if applicable) with a PDA at the Delivery
Point(s) where Pipeline tenders gas to such Delivery Point
Operator. The Delivery Point Operator shall select one of
the following forms of PDA:
(1) Swing PDA;
(2) Percentage PDA;
(3) Pro Rata PDA;
(4) Ranked PDA; or
(5) OPV PDA.
(b) If a Swing PDA is selected, the Shipper whose contract is
designated as the swing must confirm the swing election
prior to the PDA being accepted by Pipeline. If the swing
contract is terminated or is in default, Point Operator
must designate another contract as the swing or elect
another PDA methodology. If no such designation or
election is made, Pipeline shall use the Pro Rata PDA
methodology.