Carolina Gas Transmission Corporation
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2006, Docket: CP06- 71-001, Status: Effective
Original Sheet No. 105 Original Sheet No. 105 : Effective
GENERAL TERMS AND CONDITIONS
1. DEFINITIONS
“Accrual Period” shall mean a 12-month period for purposes of
determining transportation revenue sharing credits under GT&Cs Section
28.
“AGA” shall mean the American Gas Association.
“Annual Charge Adjustment” (“ACA”) shall mean the annual assessment of
charges to recover the Commission’s cost of administering its natural
gas regulatory program, recoverable by Pipeline under GT&Cs Section 26.
“Area Point” shall mean a set of Delivery Points operated by a single
Point Operator where Pipeline has determined that Shipper may aggregate
its MDDQ and such aggregation is not likely to have a detrimental
impact on Pipeline’s operations; provided that Shipper is permitted to
shift deliveries among Delivery Points in an Area Point only to the
extent that: (i) Delivery Point capacity is available; and (ii) the
shift in deliveries is operationally feasible.
“Base FRQ Period” shall mean a 12-month period ending on July 31 each
year for purposes of calculating the FRP in GT&Cs Section 25.
“Bidder” shall mean an entity, including a Prearranged Replacement
Shipper, submitting a bid to Pipeline’s Internet Website for Pipeline
capacity.
“British Thermal Unit” (“Btu”) shall mean the amount of heat required
to raise the temperature of one avoirdupois pound of pure water from
58.5° Fahrenheit to 59.5° Fahrenheit at a constant pressure of 14.73
pounds dry per square inch absolute.
“Business Day” shall mean Monday through Friday, excluding federal
banking holidays for transactions in the U.S., and similar holidays for
transactions occurring in Canada and Mexico, which holidays shall be
posted on Pipeline’s Internet Website.
“CCT” shall mean Central Clock Time, which includes the recognition of
Daylight Saving Time.