Carolina Gas Transmission Corporation

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 02/25/2009, Docket: RP09-296-000, Status: Effective

First Revised Sheet No. 23 First Revised Sheet No. 23

Superseding: Original Sheet No. 23

 

(d) Zone 2 to Zone 1 Delivery Charge. The difference between

the maximum Zone 1 and Zone 2 Volumetric Capacity Release

Rates stated in the Summary of Rates and Charges of this

Tariff multiplied by the sum of the quantities delivered in

Zone 1 using Shipper’s Zone 2 MDTQ but within Shipper’s

total MDTQ.

 

(e) Surcharges. Any surcharges applicable to service hereunder

as set forth in GT&Cs Sections 19.6 and 26, multiplied by

the sum of the delivered quantities each Gas Day during the

applicable Month, allocated under this rate schedule.

 

(f) Penalties. Any penalties applicable to service hereunder

as set forth in GT&Cs Section 27.

 

3.4 Shipper shall pay Pipeline any incremental facilities charge or

reimbursement, as applicable, for facilities under GT&Cs Section

2.

 

3.5 Service under this rate schedule shall be subject to the

applicable Fuel Retainage Percentage under GT&Cs Section 25 as

specified in the Summary of Rates and Charges of this Tariff.

 

3.6 If service is provided for only a portion of a Month, any

applicable Reservation Charges shall be prorated for the number

of Gas Days that service is provided.

 

 

4. RECEIPT AND DELIVERY POINTS

 

The Primary Receipt Point(s) at which Pipeline shall receive gas

for transportation hereunder shall be specified in an Exhibit A

to the Service Agreement, which may be superseded by a new

Exhibit A in order to add or delete specific points or make other

changes thereto the parties deem appropriate. Pipeline shall not

accept any proposed Primary Receipt Point(s) or quantity at any

Primary Receipt Point(s), or change in quantities among Primary

Receipt Point(s), if to do so would, in Pipeline’s sole judgment,

impair Pipeline’s ability to satisfy existing firm obligations,

maintain system integrity, or receive FRQ at maximum

deliverability levels, if the resulting aggregate firm MDRQs at

all of Shipper’s Primary Receipt Point(s) would exceed Shipper’s

MDTQ, or if the capacity requested by Shipper is not available at

the Primary Receipt Point(s).

 

Notwithstanding the foregoing, all Receipt Points shall be

available for use by Shipper as Secondary Receipt Points subject

to reduction of quantities nominated by Shipper based on

scheduling and curtailment and related provisions in GT&Cs

Sections 12 and 16, respectively.