Carolina Gas Transmission Corporation
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/25/2009, Docket: RP09-296-000, Status: Effective
First Revised Sheet No. 23 First Revised Sheet No. 23
Superseding: Original Sheet No. 23
(d) Zone 2 to Zone 1 Delivery Charge. The difference between
the maximum Zone 1 and Zone 2 Volumetric Capacity Release
Rates stated in the Summary of Rates and Charges of this
Tariff multiplied by the sum of the quantities delivered in
Zone 1 using Shipper’s Zone 2 MDTQ but within Shipper’s
total MDTQ.
(e) Surcharges. Any surcharges applicable to service hereunder
as set forth in GT&Cs Sections 19.6 and 26, multiplied by
the sum of the delivered quantities each Gas Day during the
applicable Month, allocated under this rate schedule.
(f) Penalties. Any penalties applicable to service hereunder
as set forth in GT&Cs Section 27.
3.4 Shipper shall pay Pipeline any incremental facilities charge or
reimbursement, as applicable, for facilities under GT&Cs Section
2.
3.5 Service under this rate schedule shall be subject to the
applicable Fuel Retainage Percentage under GT&Cs Section 25 as
specified in the Summary of Rates and Charges of this Tariff.
3.6 If service is provided for only a portion of a Month, any
applicable Reservation Charges shall be prorated for the number
of Gas Days that service is provided.
4. RECEIPT AND DELIVERY POINTS
The Primary Receipt Point(s) at which Pipeline shall receive gas
for transportation hereunder shall be specified in an Exhibit A
to the Service Agreement, which may be superseded by a new
Exhibit A in order to add or delete specific points or make other
changes thereto the parties deem appropriate. Pipeline shall not
accept any proposed Primary Receipt Point(s) or quantity at any
Primary Receipt Point(s), or change in quantities among Primary
Receipt Point(s), if to do so would, in Pipeline’s sole judgment,
impair Pipeline’s ability to satisfy existing firm obligations,
maintain system integrity, or receive FRQ at maximum
deliverability levels, if the resulting aggregate firm MDRQs at
all of Shipper’s Primary Receipt Point(s) would exceed Shipper’s
MDTQ, or if the capacity requested by Shipper is not available at
the Primary Receipt Point(s).
Notwithstanding the foregoing, all Receipt Points shall be
available for use by Shipper as Secondary Receipt Points subject
to reduction of quantities nominated by Shipper based on
scheduling and curtailment and related provisions in GT&Cs
Sections 12 and 16, respectively.