GENERAL TERMS AND CONDITIONS (Continued)

 

20. CAPACITY RELEASE (Continued)

 

recall notification period will be included in the subject line and the

effective time of the recall will be in the body of the E-mail. Recall

notifications by Transporter by other mechanisms in addition to Internet E-

mail will include at least the same level of information. (NAESB 5.3.46)

 

(c) Replacement Shipper shall provide Transporter with no more than two

Internet E-mail Addresses to be used for recall notification. The

obligation of Transporter to provide notification is waived until at least

one of the addresses has been provided. (NAESB 5.3.47)

 

(d)The Releasing Shipper shall provide capacity recall notification to

Transporter and the affected Replacement shipper in the form and with the

content set forth in (b), unless otherwise agreed. The recall notification

shall specify the recall notification period for the specified effective

gas day, as well as any other information needed to uniquely identify the

capacity being recalled. (NAESB 5.3.48)

 

The recall notification provided to Transporter shall express the quantity

to be recalled in terms of adjusted total released capacity entitlements

based upon the Elapsed Prorata Capacity (EPC). In the event of an intraday

capacity recall, Transporter will determine the allocation of capacity

between the Releasing Shipper and the Replacement Shipper(s) based upon the

EPC. Variations to the use of EPC may be necessary to reflect the nature

of Transporter's tariff, services, and/or other operational

characteristics. Transporter shall not be obligated to deliver in excess

of the total daily contract quantity of the release as a result of NAESB

WGQ Standard No. 5.3.55. The amount of the capacity allocated to the

Replacement Shipper(s) shall equal the original released capacity less the

recalled capacity that is adjusted based upon the EPC or other of

Transporter's tariff specific variations of the EPC in accordance with

NAESB WGQ Standard No. 5.3.56. (NAESB 5.3.55, 5.3.56, 5.3.57, 5.3.58)

 

(e) When capacity is recalled, it may not be reput for the same gas day.

(NAESB 5.3.53)

 

(f) The deadline for notifying Transporter of a reput is 8:00 a.m. to allow

for timely nominations to flow on the next gas day. (NAESB 5.3.54)