B-R Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2004, Docket: RP04-224-000, Status: Effective
Original Sheet No. 93 Original Sheet No. 93 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
20. CAPACITY RELEASE (Continued)
Transporter supports the function of reputting by releasing
shippers. (NAESB 5.3.7)
The reput method and rights should be specified at the
time of the deal. The reput method and rights shall be individually
negotiated between the releasing shipper and replacement
shipper. (NAESB 5.3.8)
Transporter shall post capacity release offers
and bids, including prearranged deals, upon receipt, unless
releasing shipper requests otherwise. If a releasing shipper
requests a posting time, Transporter shall
support such request insofar as it comports with the
standard timeline set forth in NAESB standard 5.3.2.
(NAESB 5.3.24)