B-R Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2004, Docket: RP04-224-000, Status: Effective
Original Sheet No. 90 Original Sheet No. 90 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
19. INTERCONNECT FACILITIES (Continued)
19.6 In addition to the above requirements in this Section 19, Transporter
shall agree to construct a new interconnect or modify an existing
interconnect on the following terms:
(a) The construction of the new interconnect shall not create any
significant operational problems for Transporter;
(b) The proposed interconnect shall not adversely affect the
rendition of existing service or adversely alter the operation of the
pipeline system;
(c) The new interconnect must be at a mutually agreeable location on
Transporter's system; provided, however, that Transporter may not deny
a shipper's request for specific placement of the interconnect without
adequate operational, environmental, or legal justification;
(d) In order to properly and prudently design and size the new
interconnect, Transporter must be provided with reasonable and
reliable data concerning the interconnecting facilities, including
delivery pressures, and anticipated hourly, daily, monthly and annual
volume levels of the service that supports the new interconnect and
such other data as is reasonably required to construct the
interconnect facility;
(e) The new interconnect must not result in any minimum pressure
receipt or delivery requirement by Transporter, unless Transporter
agrees otherwise and such agreement shall not be unreasonably
withheld. Transporter shall not be responsible for any downstream
parties' facilities, the operation or maintenance of such facilities,
or the delivery of any unauthorized volumes to such facilities; and,