B-R Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2004, Docket: RP04-224-000, Status: Effective
Original Sheet No. 59 Original Sheet No. 59 : Effective
GENERAL TERMS AND CONDITIONS (Continued)
13. OPERATING CONDITIONS (Continued)
(b) Bumping. Transporter will give scheduling priority to firm
nominations submitted during the Evening Nomination and Intraday 1
Nomination Cycles over previously nominated and scheduled volumes
for interruptible services.
The Elapsed-Prorated-Scheduled Quantity process will apply to those
nominations bumped in the Intraday 1 Nomination Cycle.
Intraday bump notices shall indicate whether daily penalties will apply
for the gas day for which quantities are reduced. Such determination
will be made in accord with the provisions of section 14.5 of these
operating conditions. (NAESB 1.3.51)
If volumes are reduced as a result of bumping, each affected
Shipper shall be deemed notified of such bumped volume(s) on
Transporter's system when Delivering Pipeline notifies Shipper of the
bump on Delivering Pipeline's system. Such notice will be provided via
the EBB, Internet E-Mail and, if requested by Shipper, via telecopier or
telephone.
Transporter and each Shipper will designate an operational contact
for Transporter to notify on a 24-hour a day, 365 days a year basis.
If Transporter is unable to notify any Shipper because that
Shipper's contact is unavailable, such Shipper will be solely
responsible for any consequences arising from such failure of
communication.