B-R Pipeline Company

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2004, Docket: RP04-224-000, Status: Effective

Original Sheet No. 59 Original Sheet No. 59 : Effective

 

GENERAL TERMS AND CONDITIONS (Continued)

 

13. OPERATING CONDITIONS (Continued)

 

 

(b) Bumping. Transporter will give scheduling priority to firm

nominations submitted during the Evening Nomination and Intraday 1

Nomination Cycles over previously nominated and scheduled volumes

for interruptible services.

 

The Elapsed-Prorated-Scheduled Quantity process will apply to those

nominations bumped in the Intraday 1 Nomination Cycle.

 

Intraday bump notices shall indicate whether daily penalties will apply

for the gas day for which quantities are reduced. Such determination

will be made in accord with the provisions of section 14.5 of these

operating conditions. (NAESB 1.3.51)

 

If volumes are reduced as a result of bumping, each affected

Shipper shall be deemed notified of such bumped volume(s) on

Transporter's system when Delivering Pipeline notifies Shipper of the

bump on Delivering Pipeline's system. Such notice will be provided via

the EBB, Internet E-Mail and, if requested by Shipper, via telecopier or

telephone.

 

Transporter and each Shipper will designate an operational contact

for Transporter to notify on a 24-hour a day, 365 days a year basis.

If Transporter is unable to notify any Shipper because that

Shipper's contact is unavailable, such Shipper will be solely

responsible for any consequences arising from such failure of

communication.