Black Marlin Pipeline Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/01/2003, Docket: RP03-472-000, Status: Effective

First Revised Sheet No. 211C First Revised Sheet No. 211C : Effective

Superseding: Substitute Original Sheet No. 211C

GENERAL TERMS AND CONDITIONS

(continued)

 

There is no limitation as to the number of intraday nominations

which a Shipper may submit at any one standard nomination cycle

or in total across all standard nomination cycles. Intraday

nominations will be effective for a single gas day, and will not

remain in effect for prospective gas days. There is no need to

renominate if intraday nomination modifies existing nomination.

Intraday nominations must have a beginning and ending time. To

the extent, a Shipper submits an intraday nomination which

specifies an effective term of longer than one day, Transporter

shall make the nomination effective for the first day of the

effective period on an intraday basis for the applicable

nomination cycle. The nomination then will be processed as a

Timely Nomination for the remaining effective term of the

nomination. Intraday nominations can be used to request

increases or decreases in total flow, changes to receipt points,

or changes to delivery points of scheduled gas. Intraday

nominations may be used to nominate new supply or market.

 

In the event capacity remains available after gas has been

scheduled or as a result of an operational or weather situation,

then Transporter may accept nominations or schedule service

after the time deadlines set forth above. Any written

nominations received after the above stated deadlines will be

scheduled after nominations received before the nomination

deadline.

 

Upon request by Transporter, Shipper shall from time to time

submit estimates of daily, monthly and annual quantities of gas

to be transported, including peak day requirements.

 

(3) Bumping

 

Nominations submitted by a firm Shipper during the Evening

or Intraday 1 Nomination Cycles shall be given scheduling

priority over nominated and scheduled volumes for

interruptible Shippers. Bumping is not permitted during the

Intraday 2 Nomination Cycle.

 

When an interruptible Shipper's scheduled volumes are to be

reduced as a result of a nomination submitted by a firm

Shipper during the Evening or Intraday 1 Nomination Cycles,

Transporter shall provide such interruptible Shipper advance

notice that its scheduled volumes are to be reduced. Such

notification shall be as set forth in Section 9.3 herein.