Black Marlin Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/1996, Docket: RP96-392-000, Status: Effective
First Revised Sheet No. 205 First Revised Sheet No. 205 : Effective
Superseding: Original Sheet No. 205
GENERAL TERMS AND CONDITIONS
(continued)
the right, in addition to all other remedies available to it by
law, to refuse to accept such deficient gas from Shipper until
such deficiency is remedied.
3. MEASURING EQUIPMENT
3.1 Installation: At each Point of Receipt or Delivery all measuring
equipment, devices and materials shall be furnished and installed,
owned, maintained and operated as mutually agreed by the parties;
provided, however, that Transporter may require, at its option, that
Shipper bear the expense of furnishing and installing such equipment
devices and materials in any instance in which such Shipper requests
a new or additional Point of Delivery or Receipt for such Shipper's
convenience. Shipper may install and operate check measuring
equipment at its expense provided such installation and operation
does not interfere with the use of Transporter's equipment.
3.2 Accessibility: Shipper shall provide or cause to be provided to
Transporter, free of charge, sufficient space on the platforms
designated as Points of Receipt on Appendix A for the Executed
Service Agreement for Transporter to install and access by helicopter
or boat its measurement facilities.
3.3 Testing Meter Equipment: The accuracy of Transporter's measuring
equipment shall be verified by test, at no more than forty-five (45)
day intervals and at other times upon request of the Shipper. No
less than 72 hours notice of the time and nature of the test shall be
given by Transporter to permit convenient arrangement for the
presence of Shipper's representative. If, after notice, the Shipper
fails to have a representative present, the results of the test shall
nevertheless be considered accurate until the next test. If any of
the measuring equipment is found to be registering inaccurately in
any percentage, it shall be adjusted at once to read as accurately as
possible. All tests of such