Kinder Morgan Illinois Pipeline LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/01/2007, Docket: RP08- 34-000, Status: Effective

Original Sheet No. 306 Original Sheet No. 306 : Effective

 

 

EXHIBIT B

DATED ............

 

Company:

 

Contract No.:

 

Delivery Point(s):

 

MDQ

Name / Location PIN No. (Dth)

------------------ ------- ------

 

PRIMARY DELIVERY POINT:

 

1. ........................................... ....... .......

...........................................

...........................................

...........................................

 

 

SECONDARY DELIVERY POINT(S):

 

2. ........................................... ....... .......

...........................................

...........................................

...........................................

 

 

 

Delivery Pressure, Assumed Atmospheric Pressure

-----------------------------------------------

 

Natural gas to be delivered by KMIP to Shipper, or for Shipper's

account, at the Delivery Point(s) shall be at the pressures available

in KMIP's pipeline facilities from time to time. The measuring party

shall use or cause to be used an assumed atmospheric pressure

corresponding to the elevation at such Delivery Point(s).