GENERAL TERMS AND CONDITIONS

----------------------------

 

agreed upon, but in case the period is not known definitely or

agreed upon, such correction shall be for a period extending over

one-half (1/2) of the time elapsed since the date of the last test.

Measurement data corrections should be processed within six (6)

Months of the production Month with a three (3) Month rebuttal

period. This standard shall not apply in the case of deliberate

omission or misrepresentation or mutual mistake of fact. Parties'

other statutory or contractual rights shall not otherwise be

diminished by this standard.

 

17.11 FAILURE OF MEASURING EQUIPMENT

 

In the event any measuring equipment is out of service,

or is found registering inaccurately and the error is not

determinable by test, or by previous recordings, receipts or

deliveries through such equipment shall be estimated and agreed to

by the parties upon the first of the following methods which is

feasible:

 

(a) By correcting the error if the percentage of error

is ascertainable by calibration, special test, or mathematical

calculation, or in the absence of (a);

 

(b) By using the registration of any check meter or

meters, if installed and accurately registering, or in the absence

of both (a) and (b), then;

 

(c) By estimating the quantity of receipt or delivery

based on receipts or deliveries during preceding periods under

similar conditions when the measuring equipment was registering

accurately.

 

17.12 PRESERVATION OF RECORDS

 

Shipper and KMIP shall preserve for a period of at least

three (3) Years, or for such longer period as may be required by

appropriate authority, all test data, applicable EFM records and

other similar records.

 

17.13 THE SEQUENCE OF GAS RECEIPT

 

All gas delivered to KMIP by any Shipper under Rate

Schedule FTS shall be deemed to have been received by KMIP prior to

the receipt of any gas delivered under Rate Schedule ITS.