Kinder Morgan Illinois Pipeline LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2007, Docket: RP08- 34-000, Status: Effective
Original Sheet No. 197 Original Sheet No. 197 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
KMIP sends Internet E-mail notification for recalling of capacity to
each affected Replacement Shipper, the subject line of the E-mail
should include the following information separated by commas in the
following order: (1) "Recall", (2) the recall notification period,
(3) the Effected Date in YYYYMMDD format, (4) KMIP's name or
abbreviation (excluding commas), and (5) KMIP's D-U-N-S number. The
body of such E-mail notification is to contain at least the affected
Replacement Shipper's Contract Number, the quantity of capacity
being recalled, and the Offer Number or Award Number, if necessary
to uniquely identify the capacity being recalled. For recalls that
are effective at non-standard times, the appropriate recall
notification period is to be included in the subject line and the
effective time of the recall is to be in the body of the E-mail. If
KMIP allows capacity recall notification mechanisms in addition to
Internet E-mail, the notification is to include at least the same
level of information. Affected Replacement Shippers are to manage
internal distribution of notifications of recall received from KMIP.
(2) The Releasing Shipper shall provide capacity
recall notification to KMIP through KMIP's Interactive Website. The
Releasing Shipper shall provide notice to its affected Replacement
Shipper at the same time it provides notification to KMIP. The
recall notification must specify the recall notification period for
the specified effective Day, as well as any other information needed
to uniquely identify the capacity being recalled. The mode of
notification is to be mutually agreed upon between the Releasing and
the Replacement Shipper.
(3) All recalled capacity notices must indicate
whether penalties will apply for the Day for which quantities are
reduced due to a capacity recall.
(d) QUANTITY ALLOCATION
In the event of an intra-Day capacity recall, KMIP
shall determine the allocation of capacity between the Releasing
Shipper and the Replacement Shipper(s) based upon the Elapsed
Prorata Capacity (EPC). In any recall notification provided to
KMIP, the quantity should be expressed in terms of the adjusted
total released capacity entitlements based upon EPC. EPC means that
portion of the capacity that would have theoretically been available
for use prior to the effective time of the intraday recall based