GENERAL TERMS AND CONDITIONS

 

 

38. PERIODIC RATE ADJUSTMENT (PRA) - FL&U REIMBURSEMENT (Contd.)

38.2 DEFINITIONS (Applicable to this Section 38) (Contd.)

 

B. Gas Compressor Fuel. The actual Fuel consumed in Gas

Compressor Stations, as determined under Section 38.4C of

these General Terms and Conditions.

 

C. Electric Compression Costs. The Gas equivalent of Electric

Power Costs, as determined under Section 38.4B of these

General Terms and Conditions.

 

D. Electric Power Costs (EPC). The cost, as determined under

Section 38.4B hereof, of electric power purchased by or for

Transporter to be used in the operation of any electric

compressor stations. EPC shall also include any related

stranded costs or other surcharges imposed by electric power

suppliers that may be billed or allocated to Transporter.

 

E. Base Period. Each twelve (12) Month period of actual

operating experience, commencing with the first Day of the

Month that service is provided.

 

F. Recovery Period. The period during which the PRA may be in

effect, which shall be a twelve (12) Month period commencing

with the effective date of the next re-determination as

specified in Section 38.3.

 

G. Receipt Quantities. The actual volumes of Gas received by

Transporter at the various Receipt Points on Transporter's

System.

 

H. Effective Date. The first Day of the Month in which changes

to the FL&U Reimbursement Percentages are to be effective.

 

I. WAMIP. The applicable previous twelve (12) Months of MIP,

weighted by the applicable twelve (12) Months of volumes and

dollars.