Rockies Express Pipeline LLC (Entrega)
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2007, Docket: CP06-354-002, Status: Effective
Original Sheet No. 211 Original Sheet No. 211 : Effective
GENERAL TERMS AND CONDITIONS
15. CAPACITY RELEASE BY FIRM SHIPPERS (Contd.)
15.14 NOMINATIONS/SCHEDULING; RECALLS AND REPUTS (Contd.)
D. Quantity Allocation
In the event of an Intra-Day Capacity recall, Transporter
shall determine the allocation of Capacity between the Releasing
Shipper and the Replacement Shipper(s) based upon the Elapsed
Prorata Capacity (EPC). In any recall notification provided to
Transporter, the quantity must be expressed in terms of the
adjusted total released Capacity entitlements based upon EPC.
EPC means that portion of the Capacity that would have
theoretically been available for use prior to the effective time
of the Intra-Day recall based upon a cumulative uniform hourly
use of the Capacity. The amount of the Capacity allocated to the
Replacement Shipper(s) must equal the original released Capacity
less the recalled Capacity that is adjusted based upon the EPC.
Transporter shall not be obligated to deliver in excess of the
total daily contract quantity of the release as a result of any
recall. The service flexibility available to either the
Releasing Shipper or the Replacement Shipper for the subject
Capacity shall not be less as a result of the recall.
E. Reputs
When Capacity is recalled, it may not be reput for the same
Gas Day.
F. Disputes
In the event of a dispute between the Releasing Shipper
and any other person as to the validity of any recall or reput, or
the status of the holder of the Capacity rights, Transporter shall
be entitled to conclusively rely on any notice provided by the
Releasing Shipper. The Original Shipper, Replacement Shipper
and/or Subreplacement Shipper involved in any such dispute shall
indemnify and hold Transporter harmless from any costs, damages or
expenses relating to Transporter's reliance on such notice.