Rockies Express Pipeline LLC (Entrega)

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/05/2010, Docket: RP10-474-000, Status: Effective

Second Revised Sheet No. 143 Second Revised Sheet No. 143

Superseding: First Revised Sheet No. 143

 

GENERAL TERMS AND CONDITIONS

 

9. DETERMINATION OF DELIVERIES

 

9.1 PREDETERMINED ALLOCATIONS

 

In accounting for the volumes delivered by Transporter, in

circumstances where multiple services are provided at any Delivery

Point, the sequence of volumes delivered shall be determined by a

predetermined allocation Agreement between Transporter and the

operator of the facilities immediately downstream of the Point at

which Transporter delivers Gas. The upstream or downstream party

providing the Point confirmation should submit the PDA to the

allocating party after or during confirmation and before the start

of the Gas Day. In the absence of such an Agreement, Sections 9.2

and 9.3 shall control. Any new or proposed change to the

methodology should be sent to Transporter before the start of the

Gas Day on which the methodology is to be effective. Transporter

shall confirm receipt of the methodology within fifteen (15)

minutes via the Interactive Website if received via the

Interactive Website or via EDI if received via EDI. Transporter's

acceptance is contingent on Transporter being able to administer

the allocation submitted by the Allocator. Allocation methodology

types upon which two parties may agree are: ranked, pro rata,

percentages, swing and operator provided value. Other examples of

allocation methods that can be used are combinations of

methodology types. Different methods may be submitted for

overages and underages.

 

9.2 DELIVERY SEQUENCE

 

Unless otherwise agreed, Gas at any Delivery Point shall be deemed

to have been delivered in the following sequence:

 

A. Volumes scheduled under Firm Service Agreements consistent

with confirmed Nominations and within MDQ;

 

B. Volumes scheduled under ITS, IBS, PALS and PAWS Agreements

consistent with confirmed Nominations and within MDQ;

 

C. Authorized Overrun Gas consistent with confirmed

Nominations;

 

D. Additional volumes shall be allocated pro rata based on

confirmed Nominations, but not to exceed the applicable MDQ,

among ITS, PALS and PAWS Agreements under which Shippers

nominated that Day; and