GENERAL TERMS AND CONDITIONS

 

4. RECEIPT POINTS

 

4.1 FACILITIES AT RECEIPT POINTS

 

Unless otherwise agreed by Transporter, Transporter shall own,

operate and maintain all pipeline and measurement facilities

necessary to receive and measure Gas hereunder. In the event that

any facilities are installed by Transporter, Section 6 of these

General Terms and Conditions shall apply.

 

4.2 OBLIGATION

 

Transporter's maximum obligation to receive Gas at the Receipt

Point(s) under the Agreement shall never exceed the lesser of:

(a) the applicable MDRQ under the Agreement in the aggregate or at

individual Points, as specified in the Agreement or as applicable

to any Point under this Tariff; or (b) the total daily volume

Shipper or its designee is able and willing to tender at the

Receipt Point(s).

 

4.3 LOCATION

 

Unless otherwise described in the Agreement, the Receipt Point(s)

for transportation Agreements shall be located at the

interconnection between the facilities of Shipper, or its

designee, and the facilities of Transporter.

 

5. RECEIPT AND DELIVERY OF GAS FOR THE ACCOUNT OF SHIPPER

 

5.1 RECEIPT AND DELIVERY VOLUMES

 

A. Commencing on the date of first acceptance by Transporter of

Gas delivered by or on behalf of Shipper at the Receipt

Point(s) pursuant to an Agreement, and continuing thereafter

during the term of that Agreement, Transporter shall deliver

Equivalent Volumes, or cause Equivalent Volumes to be

delivered, to Shipper or to a mutually agreeable third

party for Shipper's account, at the Delivery Point(s)

described in the Agreement or applicable to the Agreement

under this Tariff pursuant to Section 5.1B and C, below.