Rockies Express Pipeline LLC (Entrega)
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2007, Docket: CP06-354-002, Status: Effective
Original Sheet No. 117 Original Sheet No. 117 : Effective
GENERAL TERMS AND CONDITIONS
3. SCHEDULING AND DELINQUENCY OF PAYMENT (Contd.)
3.3 Scheduling of Firm Service at Secondary Points (Contd.)
C. If Nominations by all Shippers for Secondary Point service
for which such Shippers are eligible exceed Transporter's
available Capacity at any Secondary Point or the applicable
path, available Capacity shall be allocated and scheduled
pro rata based on Nominations within the applicable MDQ for
the zones in which Shipper has Capacity rights. Shippers
utilizing Points within the Primary Path as secondary
service shall have a higher priority than Shippers
utilizing Points outside the Primary Path as secondary
service. This priority applies for service at constrained
Points and paths. If Curtailment is necessary, such
Curtailment shall be pro rata based on each Shipper's
Nominations within its contract MDQ.
D. Shippers may nominate service at Secondary Points so that
the direction of flow is the same as or opposite
("backhaul") from the Primary Path direction of flow, if
operationally feasible, but if opposite, such Nomination
shall be treated as being outside the Primary Path, and
shall be subject to confirmation by Transporter pursuant to
acceptable operating conditions.