Rockies Express Pipeline LLC (Entrega)

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2007, Docket: CP06-354-002, Status: Effective

Original Sheet No. 56 Original Sheet No. 56 : Effective

 

RATE SCHEDULE PALS

 

6. RATE (Contd.)

6.1 (Contd.)

 

E. Shipper shall pay any other applicable charges, penalties

and fees set out in this Rate Schedule PALS or the General

Terms and Conditions of this Tariff. Deviations from the

approved PALS RO nominated volumes when compared to the

allocated volumes will be assessed cashout charges under

Section 11 of the General Terms and Conditions of this

Tariff.

 

F. Charges payable by any Shipper shall be based on the maximum

rates set forth in this Tariff applicable to Rate Schedule

PALS, which rates are hereby incorporated herein, unless a

lower rate for the charge under Subsection 6.1A of this Rate

Schedule is specified in the PALS RO. However, where a

Shipper has agreed to pay a Negotiated Rate, the rates

assessed hereunder shall be governed by Section 33 of the

General Terms and Conditions of this Tariff. A request for

service at a Negotiated Rate shall specify the Negotiated

Rate on which the Shipper is willing to agree.

 

G. The charges referenced herein cover only Park and Loan

Services. Shipper must contract separately for any

transportation service required for Shipper to move Gas to

or away from the Point(s) specified in the PALS RO.

 

6.2 Overrun Service.

 

A. Overrun Service Charges apply if a Shipper nominates and

Transporter confirms volumes in excess of the approved MAQ

and/or MDQ in the PALS Agreement, or if Shipper fails to

comply with any quantity or timing parameter in a PALS RO

(unless the failure results from Transporter not confirming

a Nomination properly submitted). Overrun Service Charges

will be assessed at the maximum PALS rate, unless otherwise

agreed to in writing by Transporter.