Rockies Express Pipeline LLC (Entrega)
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2007, Docket: CP06-354-002, Status: Effective
Original Sheet No. 56 Original Sheet No. 56 : Effective
RATE SCHEDULE PALS
6. RATE (Contd.)
6.1 (Contd.)
E. Shipper shall pay any other applicable charges, penalties
and fees set out in this Rate Schedule PALS or the General
Terms and Conditions of this Tariff. Deviations from the
approved PALS RO nominated volumes when compared to the
allocated volumes will be assessed cashout charges under
Section 11 of the General Terms and Conditions of this
Tariff.
F. Charges payable by any Shipper shall be based on the maximum
rates set forth in this Tariff applicable to Rate Schedule
PALS, which rates are hereby incorporated herein, unless a
lower rate for the charge under Subsection 6.1A of this Rate
Schedule is specified in the PALS RO. However, where a
Shipper has agreed to pay a Negotiated Rate, the rates
assessed hereunder shall be governed by Section 33 of the
General Terms and Conditions of this Tariff. A request for
service at a Negotiated Rate shall specify the Negotiated
Rate on which the Shipper is willing to agree.
G. The charges referenced herein cover only Park and Loan
Services. Shipper must contract separately for any
transportation service required for Shipper to move Gas to
or away from the Point(s) specified in the PALS RO.
6.2 Overrun Service.
A. Overrun Service Charges apply if a Shipper nominates and
Transporter confirms volumes in excess of the approved MAQ
and/or MDQ in the PALS Agreement, or if Shipper fails to
comply with any quantity or timing parameter in a PALS RO
(unless the failure results from Transporter not confirming
a Nomination properly submitted). Overrun Service Charges
will be assessed at the maximum PALS rate, unless otherwise
agreed to in writing by Transporter.