Rockies Express Pipeline LLC (Entrega)
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2009, Docket: RP06-200-051, Status: Effective
First Revised Sheet No. 5A First Revised Sheet No. 5A
Superseding: Original Sheet No. 5A
FOOTNOTES
Applicable to Rates stated on Sheet No. 5
1/ Reservation Rates are $/Dth of MDQ/Month; Commodity and Overrun Service
Charge Rates are $/Dth. Any separately stated fees and/or charges are
in addition to the rates stated herein.
2/ Zone 1 shall encompass all points west of and including the Cheyenne
Hub, located in Weld County, Colorado.
Zone 2 shall encompass all points east of the Cheyenne Hub to and
including the PEPL Interconnect, located in Audrain County, Missouri.
Zone 3 shall encompass all points east of the PEPL Interconnect,
located in Audrain County, Missouri, to and including delivery points
in Clarington, Ohio.
3/ The 100% load factor rate for FTS is equivalent to the ITS maximum
commodity rate applicable to each zone or combination of zones.