Centerpoint Energy Gas Transmission Company
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/26/2009, Docket: RP09-843-000, Status: Effective
Third Revised Sheet No. 679 Third Revised Sheet No. 679
Superseding: Second Revised Sheet No. 679
GENERAL TERMS AND CONDITIONS
(continued)
30. SEGMENTATION OF CAPACITY
30.1 To the extent operationally feasible, a Shipper that has
contracted with Transporter for firm transportation under Rate
Schedule FT over a Primary Path may, pursuant to the provisions
of this Section 30, segment its Primary Path for its own use or
for the purpose of releasing that capacity to a replacement
Shipper by identifying, through nomination or through the
capacity release process, respectively, using electronic means
prescribed by Transporter, points along the Primary Path (Segment
Receipt Point(s) and Segment Delivery Point(s)), subject to this
Tariff and assignment of capacity in accordance with the
provisions of Sections 5 and 10 of the General Terms and
Conditions. A Shipper that has contracted with Transporter for
firm transportation under Rate Schedule EFT over a Primary Path
may segment its Primary Path as described above; however, the ACE
associated with the Primary Delivery Point will not be
applicable, and the constant rate provisions of Section 5 of the
General Terms and Conditions shall be effective.
(a) A Shipper may establish a Primary Path on (1) Transporter's
Line AC, (2) any transportation capacity on Mississippi River
Transmission Corporation ("MRT") from Glendale to the boundary of
Transporter's Perryville Hub which Transporter is authorized by
the FERC to hold in its own name and does so hold (the "Acquired
MRT Capacity"); and (3) Transporter's Line F-West /F-East to the
boundary of Transporter's Perryville Hub.
(i) In order to establish a Primary Path on Line AC, a
Shipper must contract for a Primary Point of Receipt located on
Line AC (including the referenced MRT capacity) and a Primary
Point of Delivery located (1) on Line AC east of the Primary
Point of Receipt, (2) on the Acquired MRT Capacity, or (3) at the
Perryville Hub.
(ii) In order to establish a Primary Path on the Acquired
MRT Capacity, a Shipper must contract for a Primary Point of
Receipt located on the Acquired MRT Capacity and a Primary Point
of Delivery located (1) on the Acquired MRT Capacity south of the
Primary Point of Receipt, or (2) at the Perryville Hub.
(iii) In order to establish a Primary Path on Line F- West/
F-East, a Shipper must contract for a Primary Point of Receipt
located on Line F- West /F-East and a Primary Point of Delivery
located (1) on Line F-West /F-East east of the Primary Point of
Receipt or (2) at the Perryville Hub.