Centerpoint Energy Gas Transmission Company

Sixth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2010, Docket: RP10-567-000, Status: Effective

Fifth Revised Sheet No. 603A Fifth Revised Sheet No. 603A

Superseding: Fourth Revised Sheet No. 603A

 

GENERAL TERMS & CONDITIONS

(continued)

 

27. FUEL PERCENTAGES (continued)

 

27.6 Transporter will assess a zero charge for Fuel Use and Electric

Power Costs for transactions that do not require the use of

compression on Transporter's system. For each transaction

utilizing the receipt and delivery point combinations listed

below, Transporter has determined that there will not be any fuel

used since compression will not be utilized.

 

(a) LIM-1 and LIM-2 Combination

Receipt Points:

All receipt points on Transporter's Line LIM-1 south of

Station 0+00 located in Desoto Parish, Louisiana, Section

12, Township 15-North, Range 13-West.

 

Delivery Points:

The terminus of Transporter's Line LIM-2 at Gulf South

Pipeline Company located in Desoto Parish, Louisiana,

Section 20, Township 14-North, Range 12-West, and any

delivery point located on Line LIM-1 or Line LIM-2.

 

(b) Line CP Combination: All receipt point and delivery point

combinations on Line CP and the Perryville Hub Header where

the receipt point is not using compression and the delivery

point is located upstream of the receipt point.