Centerpoint Energy Gas Transmission Company
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/28/2003, Docket: RP03-239-000, Status: Effective
Original Sheet No. 511 Original Sheet No. 511 : Effective
GENERAL TERMS AND CONDITIONS
(continued)
the design throughput used to calculate the
then-current CSC Charge or, if no such actual
throughput exists, the level of volumes underlying the
calculation of the Challenger's Percentage, multiplied
by (B) the number of years then remaining in the
Recovery Period. Such an adjustment will continue to
be made during the Recovery Period until the total
jurisdictional volumes actually transported on behalf
of or sold to the Challenger equals the design
throughput used in the calculation of the adjustment.
The maximum CSC Charge calculated in this manner will
apply only to the Challenger.
18.10 Interest.
Except as provided otherwise in Section 18.9.3(a), the
interest rate applicable hereunder shall be redetermined on
the first Day of each calendar quarter and shall be equal to
the lower of (i) the rate then in effect pursuant to 18
C.F.R. §154.501, or (ii) five percent (5%) per annum.
18.11 Effectiveness.
The terms and conditions of this Section 18 shall remain in
full force and effect until July 1, 2002, and shall not be
modified, superseded or otherwise affected by any general or
other rate change filing or restatement of rates made by
Transporter under section 4 of the Natural Gas Act, or upon
any general or other change in rates ordered by the
Commission pursuant to section 5 of the Natural Gas Act.