Centerpoint Energy Gas Transmission Company
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/18/2010, Docket: RP10-383-000, Status: Effective
Fourth Revised Sheet No. 448 Fourth Revised Sheet No. 448
Superseding: Third Revised Sheet No. 448
GENERAL TERMS AND CONDITIONS
(continued)
10. ASSIGNMENT AND CURTAILMENT OF CAPACITY (continued)
Category Two: Except as otherwise specified in the
applicable Rate Schedule or specifically provided for
in the Tariff, all Gas deliverable under Rate
Schedules NNTS or RSS (withdrawals only) or all gas
scheduled under Rate Schedules RSS (for deliveries to
Storage Points of Injection), FT, FT-2, EFT, FSS, PS
(firm Pool Transfers only) or PHS (firm wheeling), as
applicable, shall be curtailed last, on a pro rata
basis based upon each Shipper's Contract Delivery
Demand, Contract Demand, Receipt Entitlement, Maximum
Receipt Obligation, Aggregation Quantity, Maximum
Delivery Obligation, Maximum Storage Quantity, Maximum
Daily Injection Quantity, Maximum Daily Withdrawal
Quantity, RSS Balance as of the end of October or
Maximum Seasonal Withdrawal Quantity, Capacity
Reserved, as applicable.
So far as operating conditions will permit, available Gas
shall be dispatched, in accordance with the
aforementioned priority and operating guidelines, in as
equitable a manner as possible. Transporter shall not be
liable in damages or otherwise for granting exemptions to
the curtailment priorities or for interrupting services
in accordance with the procedures described in this
Section 10.10. Shippers shall be entitled to eliminate
Monthly Imbalances directly resulting from, or
attributable to, compliance in the event of a curtailment
under this subsection (a) utilizing the factor of 1.00.
(b) Receipt Supply Shortfall: Notwithstanding any provision
in this Tariff, Transporter shall have the right, upon
such notice as is reasonable under the circumstances, to
interrupt deliveries in affected areas of its system if
Transporter is unable to meet its total delivery
obligations or if the operating integrity of its system,
or parts thereof, is affected detrimentally because of
underdeliveries of quantities nominated and scheduled for
receipt until Transporter is able to identify the parties
which failed to tender quantities equal to those