Centerpoint Energy Gas Transmission Company
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2010, Docket: RP10-567-000, Status: Effective
First Revised Sheet No. 339 First Revised Sheet No. 339
Superseding: Original Sheet No. 339
GENERAL TERMS AND CONDITIONS
(continued)
2. MEASUREMENT EQUIPMENT (continued)
of charts, shall be done only by the primary measuring party or
its representative and in accordance with good engineering
practice as often as found necessary in operation. The non-
measuring party shall have access to the primary measuring party's
equipment at any reasonable time. Subject to the limitations of
Section 3.4, upon the non-measuring party's request, the measuring
party shall promptly verify the accuracy of any particular meter
or other equipment, the cost of such special test, or any other
test or adjustment requested by the non-measuring party and agreed
to by the measuring party, to be borne by the non-measuring party,
unless the percentage of inaccuracy exceeds two percent (2%). If
upon any test the total inaccuracy from meter or auxiliary
equipment error exceeds two percent (2%), previous readings shall
be corrected but not beyond the close of the preceding Month. If
the total inaccuracy is not more than two percent (2%), previous
readings shall be considered correct, but immediately following
the test the equipment shall be adjusted, if necessary, to read
accurately. Estimate missing or late measurement data and treat
actual as a prior period adjustment, with the measuring party to
provide the estimate. If any meter or auxiliary equipment is out
of service or repair or registering inaccurately for a period of
time so that the amount of Gas cannot be computed from the reading
thereof, the Gas delivered during such period shall be estimated
on the basis of the first of the following methods feasible: (a)
correct the error if the percentage of error is ascertainable by
calibration, test or mathematical calculation; (b) use the
registration of any check equipment installed and accurately
registering; or (c) estimate the volume on the basis of deliveries
during preceding or subsequent periods under similar conditions
when the equipment was registering accurately.
3.6 Title in Facility. Title to all facilities and equipment placed
by Transporter on Shipper's (including its designees) premises or
on premises of others pursuant to rights or licenses held by
Shipper shall remain in Transporter, with the unqualified right of
removal, and no charge shall be made for use of the premises
occupied by same. Shipper shall ensure that Transporter has
reasonable access to all