Centerpoint Energy Gas Transmission Company

Sixth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2010, Docket: RP10-567-000, Status: Effective

First Revised Sheet No. 314 First Revised Sheet No. 314

Superseding: Original Sheet No. 314

 

GENERAL TERMS AND CONDITIONS

(continued)

 

1. DEFINITIONS AND INTERPRETIVE MATTERS (continued)

 

Internet Web Site. See Section 22.

 

Interruptible Maximum Daily Injection Quantity. See

Section 6 of Rate Schedule ISS.

 

Interruptible Maximum Daily Withdrawal Quantity. See Section 6 of

Rate Schedule ISS.

 

Interruptible Maximum Storage Quantity. See Section 6 of Rate

Schedule ISS.

 

Interruptible Working Gas Quantity. See Section 6 of Rate

Schedule ISS.

 

Intraday 1 Nomination Cycle. See Sections 5.2(a)(i)(3) and

5.5(a)(i)(3).

 

Intraday 2 Nomination Cycle. See Sections 5.2(a)(i)(4) and

5.5(a)(i)(4).

 

Intraday Nomination shall mean a prospective nomination submitted

after the deadline for the Timely Nomination Cycle. An Intraday

Nomination must end at the end of the Day for which the

nomination is submitted.